Pageviews past week
Tuesday, June 7, 2016
Thursday, June 2, 2016
Ready to Blast
The municipality has removed much of the overburden exposing the major rock to be removed. The blasted rock will be used to raise the road further to the north, decreasing the slope.
Wednesday, June 1, 2016
Langfords Rock
The nasty rock and twisty, blind 'S' turn near Langfords farm is being cleared of overburden with heavy equipment. It appears that the municipality is going to blast out that rock which will allow for safer travel and also assist in drainage during storms.
Saturday, May 28, 2016
Limestone Crusher Run
A tandem of 5/8" limestone crush
deposited on JK woodlot. If you have a pothole on the road you want to fill, please feel free to take some. Another load will be deposited at the past location of gravel.
deposited on JK woodlot. If you have a pothole on the road you want to fill, please feel free to take some. Another load will be deposited at the past location of gravel.
Sunday, May 22, 2016
Saturday, May 14, 2016
Missing dock
An ELCA cottager has just reported a missing dock, approximately 8 x 24 feet and filled with 16 floats. Chains are still attached to trees on the shore. It may have drifted to the southern end of the lake. OR, someone may have a newly acquired dock.
Please let us know if you see a large floating dock, or a cottager who suddenly has a newly acquired dock.
Please let us know if you see a large floating dock, or a cottager who suddenly has a newly acquired dock.
Monday, May 2, 2016
Ontario Hydro
Hydro One has been in today and inspecting the line for trees that threaten power transmission.
The last 'cleaning' of the hydro right-away was 2008.
Subscribe to:
Posts (Atom)

